On-site-lifting operations


On-site lifting / loading and unloading operations

If you plan to bring heavy equipment for demonstration and you need a forklift or other equipment for on-site loading and unloading at the exhibitionplease contact SK-Expo company, which is an accredited contractor for on-site loading and unloading questions. The cost of works and technical issues should be agreed with SK-Expo.

ATTENTION!
 There are restrictions for bulky equipment:
- For stands of the lower half of the expo hall (between the entrance and round columns) - the load is NOT MORE THAN 300 kg per 1 sq.m.
- For stands of the higher half of the expo hall (behind round columns) the load is NOT MORE THAN 2000 kg per 1 sq.m.
- Loading and unloading with using a forklift or other special equipment is possible only in the area of the stands of the higher half of the expo hall (behind round columns)
 Dimensions of the gates used for equipment delivery: height - 3600 mm; width - 3200 mm

Exhibition plan is available here

Please contact managers of SK-Expo with the note that you are an exhibitor at Waste Management, which takes place at the ACCO International Exhibition Center on the mentioned dates, the organizer is Business Forum company.

Contacts of SK-Expo managers:

Ivan Prokopenko +38 050 382 82 42
Yuriy Korzhenko +38 044 374 94 97, +38 044 374 94 98
This email address is being protected from spambots. You need JavaScript enabled to view it.